Element management of an active runway rehabilitation program covering pavement, taxiway interfaces, airfield lighting, FAA NAVAID coordination, drainage, grading, and complex operational phasing.
- Role
- Element Manager
- Period
- 2025 – Present
- Status
- ongoing
Purpose
A rehabilitation of Runway 18L/36R and its connecting infrastructure, building on the delivery approach proven on Runway 17R/35L.
Engineering and delivery challenges
- Complex operational phasing to maintain airfield capacity during construction
- Coordination of FAA NAVAID systems and airfield lighting with pavement work
- Drainage and grading interfaces with adjacent taxiways
Role and responsibilities
- Element management across design coordination, construction management, and stakeholder interfaces
Scope
- Runway pavement rehabilitation
- Taxiway interfaces, airfield lighting, drainage, and grading
- FAA NAVAID coordination