Project portfolio
Airport engineeringOngoingapron
Southwest Hardstands and Airfield Support Infrastructure
Dallas Fort Worth International Airport
Design and construction management of approximately 930,000 square feet of concrete hardstand supporting aircraft parking, deicing, and ground-support equipment operations.
- Role
- Element Manager
- Period
- 2025 – Present
- Value
- Approx. $72M authorized
- Status
- ongoing
Purpose
Hardstands provide remote aircraft parking and support positions that relieve gate demand and support deicing and ground-support equipment functions. This program adds heavy-duty concrete hardstand capacity on the southwest side of the airfield.
Engineering and delivery challenges
- Heavy-duty rigid pavement design for aircraft parking and deicing operations
- Utility, drainage, and ground-support equipment coordination
- Maintaining airfield operations adjacent to active construction
Role and responsibilities
- Element management of design and construction for the owner-representative team
- Coordination of design packages, construction phasing, and stakeholder reviews
Scope
- Approximately 930,000 square feet of concrete hardstand and supporting infrastructure
Work performed as part of multidisciplinary owner-representative teams on the DFW airfield capital program. Figures are as reported for the project and describe team outcomes.